Roof Edge Protection

  branches   |  about   |  catalogues   |  history   |  ordering   |  technical   |  email   |  contact   |  home   


PRODUCT SELECTOR:
Wrought Iron Components
Wire Mesh & Edging Sections
Tube Clamps & Tube
Expanded Metal
Perforated Metal
Flooring & Gratings
Handrailing
Steel Fencing Products
Perimeter Security
Roof Edge Protection
Gate Automation
Cantilever Gate Accessories
Sliding Door Hardware
Welding Products
Steel Sections
Channel Support
Steel Wire
Post Boxes
Paint and Sundries


Roof Edge Protection - System Assembly

Free End Installations
DEFENDER Roof Edge Protection System - Free End Installations

1 Refer to the project drawing

2 Lay the first Post at the start position

3 Attach a Run End Counterweight assembly to the first Post

4 Position the second Post

5 Attach a Counterweight to the second Post

6 Position the third Post

7 Position the fourth Post and attach a Counterweight

8 Drop handrail and kneerail into cradle fittings

9 Repeat the procedure until completion

10 Check that the maximum spacing for posts is no greater than 2000mm

11 Check that the maximum spacing for Counterweights is no greater than 4000mm

12 Check that there is a Run End Counterweight and adjacent Counterweight at each end of a run

 

Closed Installations

1 Refer to the project drawing

2 Lay the first Post at the start position

3 Attach a Counterweight to the first Post

4 Position the second Post

5 Position the third Post and attach a Counterweight

6 Drop handrail and knee rail into cradle fittings

7 Repeat the procedure until completion

8 Check that the maximum spacing for posts is no greater than 2000mm

9 Check that the maximum spacing for Counterweights is no greater than 4000mm

DEFENDER Roof Edge Protection System Closed Installation Assembly

 

Details of Main System Parts

back to Edge Protection index

visit the Roof Edge Protection section in our
Online Store website for full range details

© Copyright 2012 FH Brundle site design: Net-Coms     hosting: Consult-X